PROJECT DATA

Nad al Sheba Villas in Dubai rely on AluFix and MevaDec systems for fast workflows

Project: Construction of 489 residential units in Nad Al Sheba, Dubai, UAE

Contractor: Trojan General Contracting CO.LLC and United Engineering Construction (UNEC)

MEVA Solution: Hand-set formwork AluFix, Hand-set slab system MevaDec

Engineering and support: MEVA KHK Formwork Systems, Dubai, United Arab Emirates

 
 
1
2
 

Project

Residential Project: High Speed on Slabs and Columns

Construction is underway on a complex of 489 villas in the Nad Al Sheba area of Dubai. Three to five-bedroom luxury villas will be up for for lease after completion, as well as 100 serviced homes with private swimming pools. The development will include a clubhouse and a retail centre with shops, cafes, a community pool and sports facilities. Residents of the complex will have access to Nakheel’s beach facilities on Palm Jumeirah and daily transport services to the city’s malls and attractions.

Large-scale residential works of this kind rely on speed and efficiency to keep concrete works on schedules that are typically tight. Delays would pose a serious risk.

To master the extensive slab work, the MevaDec slab system once more proved to be best in class in terms of cost, speed and quality. These benefits come from flexibility with filler areas, quick adaptation to building layouts and reduced inventory. This is thanks to early stripping which allows the panels and beams to be stripped very soon after the pour and re-used on the next section. In addition, MevaDec is set up entirely by hand, reducing crane time. The hand-set wall formwork system AluFix proved ideal for the columns, all of which required a smooth concrete finish. AluFix won hands down on this count.

 
  • MEVA Expertise & References

    MEVA Expertise & References

    Referencen for Projets in Commercial & Residential Construction, Architectural Construction, High-Rise Construction and Civil Engineering Construction

  • Challenging tunnel geometry

    Challenging tunnel geometry

    MEVA STB 450 offers flexible solution for narrow, inclined rail section: Near the municipality of Gretzenbach, the four-track route branches into two separate lines. Here, the two southern tracks gradually descend and pass below the cantonal road before entering the new Eppenberg Tunnel.

  • BIM: transparent and efficient

    BIM: transparent and efficient

    BIM stands for Building Information Modelling, a holistic, software-based method for optimised planning and execution of construction projects.

  • A triumphant premiere: fish passes

    A triumphant premiere: fish passes

    The focus of MEVA's first collaboration with Austrian company GLS was nature conservation and the construction of two fish passes on the River Traun.

All Plastic Facing alkus
MEVA Frame Profile
... more than just formwork
  •  Select language

    Select continent and country. Language selection optional.

  •  Contact
  •  Search

    Search on our website.

  •  Newsletter

    Subscribe to our monthly newsletter.