PROJECT DATA

Al Lusaily Reservoir, Dubai, United Arab Emirates

Contractor: Ghantoot Contracting

MEVA Systems: Wall formwork Mammut 350, Column heads: special designs, small series steel production

Formwork engineering: MEVA KHK Formwork Systems, Dubai, UAE

 
 
1
2
3
 

Project

Al Lusaily Reservoir, Dubai, United Arab Emirates

Efficient Special Designs

Dubai Electricity and Water Authority has completed building the water reservoir at Al Lusaily. The reservoir has a capacity of 450 million litres of desalinated water to improve and extend the city’s fresh water supply.

For MEVA KHK, it proved yet another succesful large-scale water project. The engineering team provided Ghantoot Contracting with design and formwork inventory for the columns, tank and baffle walls. Very fast pours to heights above 5 m were achieved with the heavy-duty formwork system Mammut 350 and its 100 kN/m² load capacity.

Columns with special design

The next challenge was pouring hundreds of columns with large mushroom- shaped column heads. MEVA engineers developed, designed and produced special L-shape steels units in two heights to handle all the pours easily and fast. The solution proved cost-effective and contributed to a zero hitch workflow.

 
  • MEVA Expertise & References

    MEVA Expertise & References

    Referencen for Projets in Commercial & Residential Construction, Architectural Construction, High-Rise Construction and Civil Engineering Construction

  • Challenging tunnel geometry

    Challenging tunnel geometry

    MEVA STB 450 offers flexible solution for narrow, inclined rail section: Near the municipality of Gretzenbach, the four-track route branches into two separate lines. Here, the two southern tracks gradually descend and pass below the cantonal road before entering the new Eppenberg Tunnel.

  • Plant-shaped viewing tower at Lake Velence

    Plant-shaped viewing tower at Lake Velence

    MEVA's StarTec and Radius wall formwork played a starring role in the construction of a 20 m tall, plant-shaped viewing tower, built by the shore of Lake Velence, south-west of Budapest.

  • A triumphant premiere: fish passes

    A triumphant premiere: fish passes

    The focus of MEVA's first collaboration with Austrian company GLS was nature conservation and the construction of two fish passes on the River Traun.

All Plastic Facing alkus
MEVA Frame Profile
... more than just formwork
  •  Select language

    Select continent and country. Language selection optional.

  •  Contact
  •  Search

    Search on our website.

  •  Newsletter

    Subscribe to our monthly newsletter.