Project Data

MevaDec: the right tool to handle irregular slab layouts

Project: Renovation/Extension of Hôpital Cochin clinic, Paris. With 2-level parking lot, 4 levels with room heights over 4 m, pour cyles of 300 m²

Contractor: SICRA île de France, Groupe Vinci

MEVA systems: Slab formwork MevaDec, Shoring tower MEP

Formwork Engineering: MEVA Formwork Systems, France

 
 
1
2
3
4
 

Project

MevaDec: No Fixed Grid

Flexible in handling irregular slab layouts without a single right angle

Urban construction sites often battle with confined space and congested delivery access. This was the case when the Hôpital Cochin clinic in Paris was rebuilt and extended. 42.000 m² of slabs had to be poured on 5 levels and within a tight time schedule. What’s more, the site had to master irregular and constantly changing slab layouts without a single right angle.

This added up to a Formula 1 challenge for the MevaDec system. It is the only system that does not follow a rigid grid. The panels can change direction flexibly and compensation areas thus be reduced to below 20 cm. Site-built filler areas are thus minimised, saving time and labour. Forming around the large numbers of columns made this benefit very apparent. Using identical parts, the workers simply left out a panel and slid in secondary beams around the columns, on which they laid out wooden facing to fill the small compensation area.

The site also relied on MEVA’s shoring system MEP to achieve slab heights beyond 4 m and support the many concrete beams.

 
  • MEVA Expertise & References

    MEVA Expertise & References

    Referencen for Projets in Commercial & Residential Construction, Architectural Construction, High-Rise Construction and Civil Engineering Construction

  • Challenging tunnel geometry

    Challenging tunnel geometry

    MEVA STB 450 offers flexible solution for narrow, inclined rail section: Near the municipality of Gretzenbach, the four-track route branches into two separate lines. Here, the two southern tracks gradually descend and pass below the cantonal road before entering the new Eppenberg Tunnel.

  • Plant-shaped viewing tower at Lake Velence

    Plant-shaped viewing tower at Lake Velence

    MEVA's StarTec and Radius wall formwork played a starring role in the construction of a 20 m tall, plant-shaped viewing tower, built by the shore of Lake Velence, south-west of Budapest.

  • A triumphant premiere: fish passes

    A triumphant premiere: fish passes

    The focus of MEVA's first collaboration with Austrian company GLS was nature conservation and the construction of two fish passes on the River Traun.

All Plastic Facing alkus
MEVA Frame Profile
... more than just formwork
  •  Select language

    Select continent and country. Language selection optional.

  •  Contact
  •  Search

    Search on our website.

  •  Newsletter

    Subscribe to our monthly newsletter.