PROJECT DATA

3.000 m² MEVA Formwork on Coop Logistics Centre in Schäfisheim, Switzerland

Project: Coop logistics centre with production and distribution facilities on 8 upper levels, ground floor and 5 storey basement on 300x100 m layout

Owner: Coop Genossenschaft, Switzerland

Contractor: Marti Bauunternehmung AG, Zurich

MEVA Systems: Wall formwork Mammut 350, foldable working platform KAB 190, climbing platform KLK 230, Triplex-R heavy-duty props

Formwork engineering: MEVA Formwork Systems, Seon, Switzerland

 
 
1
2
3
4
 
  • MEVA Expertise & References

    MEVA Expertise & References

    Referencen for Projets in Commercial & Residential Construction, Architectural Construction, High-Rise Construction and Civil Engineering Construction

  • Challenging tunnel geometry

    Challenging tunnel geometry

    MEVA STB 450 offers flexible solution for narrow, inclined rail section: Near the municipality of Gretzenbach, the four-track route branches into two separate lines. Here, the two southern tracks gradually descend and pass below the cantonal road before entering the new Eppenberg Tunnel.

  • Plant-shaped viewing tower at Lake Velence

    Plant-shaped viewing tower at Lake Velence

    MEVA's StarTec and Radius wall formwork played a starring role in the construction of a 20 m tall, plant-shaped viewing tower, built by the shore of Lake Velence, south-west of Budapest.

  • A triumphant premiere: fish passes

    A triumphant premiere: fish passes

    The focus of MEVA's first collaboration with Austrian company GLS was nature conservation and the construction of two fish passes on the River Traun.

All Plastic Facing alkus
MEVA Frame Profile
... more than just formwork
  •  Select language

    Select continent and country. Language selection optional.

  •  Contact
  •  Search

    Search on our website.

  •  Newsletter

    Subscribe to our monthly newsletter.