PROJECT DATA

Novartis production facilities poured with Mammut 350

Project: Novartis NPH NLSF, Stein, Switzerland

Contractor (and Architects): Erne AG Bauunternehmung, Laufenburg, Switzerland

MEVA Systems: wall formwork Mammut 350, safety System SecuritBasic with slip-free Aluminium corrugated sheet, MEVA FormSet safety mesh

Formwork Engineering: MEVA Schalungs-Systeme, Seon, Switzerland

 
 
1
2
3
4
5
6
 

Project

SecuritBasic: Safety First

SecuritBasic is a complete, modular safety system for all of today’s MEVA wall systems EcoAs, AluFix, AluStar, StarTec and Mammut 350.

Different equipment configurations
SecuritBasic is available in four Equipment configurations – depending on requirements and preferences. They
range from the simple wooden planking all the way to the comfortable, non-slip corrugated aluminium sheet.
Platform lengths from 1.25 to 2.50 m allow you to adapt to the formwork setup easily and flexibly. Comfortable
and , safe working conditions are provided by the platform‘s 75 cm width. The system includes working
platform, back and front guard railing, side railing access hatch with ladder, inside corner platform and compensation platform.

Free choice of planking
You have the choice between jobbuilt wooden planking, prefabricated wooden planking or a prefabricated non-slip corrugated a aluminium sheet which is available with or without integrated access hatch and ladder.

Easy assembly and handling
SecuritBasic is assembled safely on the ground and moved as a complete unit together with the formwork in a single crane lift. That saves assembly time and keeps workflow smooth. All that is required to erect and lift the unit is a lifting arm and a standard crane hook.

Attach to multi-function profile
As with all accessories, SecuritBasic is attached to the multi-function profile‘s welded-in Dywidag nut. This unique MEVA feature means you need no addon attachments or clumsy parts that could slip away. Work becomes easier, safer and faster.

Brace frames attached to the back
Brace frames are attached to the back of the platform, i.e. the planking is not interrupted, avoiding stumbling
and tripping obstacles, and optimising worker safety. Another benefit is that multi-function profiles remain free for other attachments.

 
  • MEVA Expertise & References

    MEVA Expertise & References

    Referencen for Projets in Commercial & Residential Construction, Architectural Construction, High-Rise Construction and Civil Engineering Construction

  • Plant-shaped viewing tower at Lake Velence

    Plant-shaped viewing tower at Lake Velence

    MEVA's StarTec and Radius wall formwork played a starring role in the construction of a 20 m tall, plant-shaped viewing tower, built by the shore of Lake Velence, south-west of Budapest.

  • High above Manchester

    High above Manchester

    Four apartment buildings at heights up to 202 m by 2020: the city centre redevelopment project Deansgate Square. In use for a total of 194 storeys: the automatic MAC climbing system from MEVA

  • South Canal Bridge, Ontario: With no crane possible at busy Hwy 400, MevaLite handles the job with ease

    South Canal Bridge, Ontario: With no crane possible at busy Hwy 400, MevaLite handles the job with ease

    One of Ontario’s busiest transportation corridors, Highway 400, began a major expansion project through Kings Township in late 2016. This $79.3 million dollar (CAD) project includes the widening of the highway from three to six lanes in each direction for a two mile stretch and also entails safer on and off ramps, the expansion and realignment of culverts, and the replacement of two bridges − one of them the South Canal Bridge.

All Plastic Facing alkus
MEVA Frame Profile
... more than just formwork
  •  Select language

    Select continent and country. Language selection optional.

  •  Contact
  •  Search

    Search on our website.

  •  Newsletter

    Subscribe to our monthly newsletter.