PROJECT DATA

Proton Therapy Centre with wall thickness of 28 ft and slab thickness of 10 ft

Project:  Proton Therapy Centre, Houston, Texas
28 ft wall thickness, 10 ft. slab thickness, 102,257 ft² floor area

MEVA Systems: MEVA heavy-duty wall formwork Imperial with 2,025 psf load capacity

Concreting Specifications: 

  • 3,000 mixer loads of concrete delivered in 10 minutes intervals
  • 300 cubic yards (8122 ft3) of concrete poured every hour
  • 2 concrete pumps running at max. performance (140-160 instead of the normal 90-100 cy/h)

Engineering: MEVA Formwork Systems, Springfield, OH

 
 
1
2
3
 
  • MEVA Expertise & References

    MEVA Expertise & References

    Referencen for Projets in Commercial & Residential Construction, Architectural Construction, High-Rise Construction and Civil Engineering Construction

  • Plant-shaped viewing tower at Lake Velence

    Plant-shaped viewing tower at Lake Velence

    MEVA's StarTec and Radius wall formwork played a starring role in the construction of a 20 m tall, plant-shaped viewing tower, built by the shore of Lake Velence, south-west of Budapest.

  • High above Manchester

    High above Manchester

    Four apartment buildings at heights up to 202 m by 2020: the city centre redevelopment project Deansgate Square. In use for a total of 194 storeys: the automatic MAC climbing system from MEVA

  • Balancing act between creativity and technological feasibility

    Balancing act between creativity and technological feasibility

    Complex geometries and exacting requirements constantly present MEVA’s Special Design department with exciting tasks – during the renovation of a church in the Upper Bavarian village of Hebertshausen, for example.

All Plastic Facing alkus
MEVA Frame Profile
... more than just formwork
  •  Select language

    Select continent and country. Language selection optional.

  •  Contact
  •  Search

    Search on our website.

  •  Newsletter

    Subscribe to our monthly newsletter.