PROJECT DATA

MEVA’s adjustable Radius System MAR introduced to the United States

Project: Oregon Water Treatment Plant Lucas County—Oregon, OH

Contractor: HPH/Mosser, Oregon, OH

MEVA Systems: Imperial Wall Formwork, MEVA Adjustable Radius MAR

Engineering and support: MEVA Formwork Systems, Inc. Springfield, OH

 
 
1
2
3
4
5
6
7
 

Project

Setting the Pace: Water Treatment Plant Construction

The city of Toledo and its surrounding areas have been fighting against algae plumes from Lake Erie in drinking water for several years, culminating in the much publicized Toledo drinking water ban of 2014. As a consequence, the Oregon Waste Water district, just outside of Toledo, began work on a new Waste Water Treatment Plant (WWTP). The new plant will employ ozone on settled water to break up contaminants into small particles in conjunction with a Biologic Active Filtration System (BAF).

This project required a treatment tank with a radius of 80 ft and over 20 ft in height. Construction had to follow a tight schedule and weather conditions made the schedule even tighter. The new MAR (MEVA Adjustable Radius) system was the perfect solution for the contractor’s needs.

Traditional forming systems for water treatment tanks often arrive on site in hundreds of pieces that require time, manpower, and parts to put together. Not so the MAR which comes preassembled and saves the contractor time and money on every pour.

Pouring, setting and stripping with a team of five workers
The MAR system was delivered to site in easy-to-handle units. HPH flew in the pre-assembled formwork with a crane and made only simple adjustments on-site since the radius was pre-set to the exact specifications. Significantly, HPH was able to stay on schedule despite weather challenges with a crew of just five workers, again saving time and labor. They were able to work on two-day cycles and complete all 8 pours in four weeks.

 
  • MEVA Expertise & References

    MEVA Expertise & References

    Referencen for Projets in Commercial & Residential Construction, Architectural Construction, High-Rise Construction and Civil Engineering Construction

  • Challenging tunnel geometry

    Challenging tunnel geometry

    MEVA STB 450 offers flexible solution for narrow, inclined rail section: Near the municipality of Gretzenbach, the four-track route branches into two separate lines. Here, the two southern tracks gradually descend and pass below the cantonal road before entering the new Eppenberg Tunnel.

  • BIM: transparent and efficient

    BIM: transparent and efficient

    BIM stands for Building Information Modelling, a holistic, software-based method for optimised planning and execution of construction projects.

  • A triumphant premiere: fish passes

    A triumphant premiere: fish passes

    The focus of MEVA's first collaboration with Austrian company GLS was nature conservation and the construction of two fish passes on the River Traun.

All Plastic Facing alkus
MEVA Frame Profile
... more than just formwork
  •  Select language

    Select continent and country. Language selection optional.

  •  Contact
  •  Search

    Search on our website.

  •  Newsletter

    Subscribe to our monthly newsletter.